Stamper ID: NDT5

Lifetime Found Bill Report Ranking: Unranked

Stamped in All States Ranking: Unranked


Why I Stamp:

Download link:

Dallas Prequalified Moment Frame Connection Code 2016 w/ Supplement 1-2018 pdf

The Dallas Prequalified Moment Frame Connection Code 2016 with Supplement 1-2018 provides guidelines and standards for prequalified moment frame connections in structural engineering projects in Dallas. These codes are designed to ensure that moment frame connections are structurally sound and meet specific requirements for safety, stability, and performance. Contractors must adhere to these codes to ensure that moment frame connections are properly designed and constructed to withstand various loads and forces in a building structure.

Name: Melody Crawford
Address: 2 ADDIES LN, WILLIAMSPORT PA 17702, USA
Email: JohnsonDanielKhWBFn+Melody.Crawford@gmail.com

Recent Sightings

No recent sighting activity.